An independent civic project — not an official government website How to tell

No seal, no .gov.ph address. Official municipal websites use a government domain and the municipal seal. This site uses neither, by design.

Every figure is sourced. Each number links to the government document it came from. Where they differ, the original document is authoritative.

Open and volunteer-built. Part of the BetterGov.ph Better LGU community. About this project

Completed
166
of 179 projects
For Procurement
8
As DPWH last reported
On-Going
5
As DPWH last reported
Barangays named
25of 25
In DPWH’s descriptions
Source Department of Public Works and Highways +1 Reported 30 September 2026, not yet confirmed Caveat: These are DPWH’s own published figures, read through BetterGov.ph’s mirror of them; they are contract budgets, not audited spending, and progress is as DPWH last reported it. A project is placed in Calatagan only when DPWH’s description says so; a few described vaguely may be missed. : show method and sources for these projects

Current

Data
DPWH infrastructure years 2016–2026
Checked
Reported 30 September 2026, not yet confirmed
Refresh
Updated quarterly

These are national government projects implemented by DPWH (mostly its Batangas 1st District Engineering Office), not projects of the municipal government.

Every DPWH contract whose record mentions Calatagan was read, then kept only if its own description places the work in Calatagan, Batangas ("…, CALATAGAN, BATANGAS"). Contracts on the Nasugbu–Lian–Calatagan national road that give kilometre posts but no municipality, and packages that bundle Calatagan with another municipality, are listed separately and not counted. Barangays are read from the description. The rule is tested against real descriptions (scripts/lib/dpwh-location.test.ts).

  1. DPWH infrastructure projects (contracts, budgets, contractors, status) Department of Public Works and Highways, via the BetterGov.ph DPWH transparency API · Search "Calatagan"; each contract read from /projects/{contractId} · Accessed 30 September 2026
  2. BetterGov.ph Transparency — DPWH projects BetterGov.ph · Accessed 30 September 2026

About our sources

By year

Contract budgets by DPWH infrastructure year

Sum of DPWH contract budgets for projects located in Calatagan, by infrastructure year
View as a table
DPWH projects located in Calatagan, by infrastructure year
YearProjectsContract budgets
20266Not listed yet
202528₱599,996,341
202413₱235,854,407
202315₱141,319,166
202213₱127,982,771
202113₱93,937,458
202012₱72,141,686
201915₱63,132,579
201817₱248,964,226
201717₱84,779,058
201630₱157,568,978

Every contract

Projects

Showing all 179 projects

    • Construction of Multi-Purpose Building (Covered Court), Enrique Zobel Elementary School, Calatagan, Batangas

      Buildings 26DB0003

      Contract details
      Full description
      CSSP - SIPAG -Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building (Covered Court), Enrique Zobel Elementary School, Calatagan, Batangas (13.8723094, 120.6650496)
      Type
      Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys)
      Bidders
      3
      Approved budget (ABC)
      ₱4,900,000
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2026 Status For Procurement Budget Not yet listed
    • Construction of Multi-Purpose (Covered Court), Gulod Elementary School, Calatagan, Batangas

      Gulod Buildings 26DB0004

      Contract details
      Full description
      CSSP- Sustainable Infrastructure Proj Alleviating Gaps- SIPAG - Multi-Purpose Buildings/ Facilities to Support Social Services- Construction of Multi-Purpose (Covered Court), Gulod Elementary School, Calatagan, Batangas(13.874417,120.625421)
      Type
      Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys)
      Bidders
      3
      Approved budget (ABC)
      ₱4,900,000
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2026 Status For Procurement Budget Not yet listed
    • Construction of Multi-Purpose Building, Hukay Elementary School, Calatagan, Batangas

      Hukay Buildings 26DB0005

      Contract details
      Full description
      CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Multi-Purpose Buildings/ Facilities to Support Social Services- Construction of Multi-Purpose Building, Hukay Elementary School, Calatagan, Batangas
      Type
      Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys)
      Bidders
      1
      Approved budget (ABC)
      ₱4,900,000
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2026 Status For Procurement Budget Not yet listed
    • Construction of Multi-Purpose (Barangay Hall), Barangay Lucsuhin, Calatagan, Batangas

      Lucsuhin Buildings 26DB0006

      Contract details
      Full description
      Cssp-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Sipag-Multi-Purpose Buildings/Facilities to Support Social Services-Construction of Multi-Purpose (Barangay Hall), Barangay Lucsuhin, Calatagan, Batangas (13.878715, 120.640891)
      Type
      Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys)
      Bidders
      2
      Approved budget (ABC)
      ₱4,900,000
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2026 Status For Procurement Budget Not yet listed
    • Construction of Multi-Purpose Building with Site Development, Carlosa Elementary School, Calatagan, Batangas

      Carlosa Buildings 26DB0047

      Contract details
      Full description
      CSSP - (SIPAG) - SIPAG - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building with Site Development, Carlosa Elementary School, Calatagan, Batangas(13.875693,120.679744)
      Type
      Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys)
      Bidders
      0
      Approved budget (ABC)
      ₱9,800,000
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2026 Status For Procurement Budget Not yet listed
    • Construction of Multi-Purpose Building, Enrique Zobel Elementary School, Calatagan, Batangas

      Buildings 26DB0048

      Contract details
      Full description
      CSSP- SIPAG - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building, Enrique Zobel Elementary School, Calatagan, Batangas (13.8726899, 120.6653094)
      Type
      Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys)
      Bidders
      0
      Approved budget (ABC)
      ₱9,800,000
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2026 Status For Procurement Budget Not yet listed
    • KATUPARAN) Access Road Leading to Calatagan Port, Calatagan, Batangas

      GAA 2025 CP 25D00052

      Contract details
      Full description
      Construction/ Improvement of Access Roads Leading to Seaports (Kalsada Tungo Sa Paliparan, Riles at Daungan Program - KATUPARAN) Access Road Leading to Calatagan Port, Calatagan, Batangas
      Type
      GAA 2025 CP
      Contractor
      ALRIE CONSTRUCTION SERVICES
      Bidders
      3
      Approved budget (ABC)
      ₱175,038,455
      Start
      10 April 2025
      Source of funds
      Regular Infra - GAA 2025 CP
      Implementing office
      DPWH Region IV-A
      Record
      This contract on BetterGov Transparency
      Year2025 Status On-Going · 21.63% Budget ₱171,540,602
    • Construction of Water System in Barangay Hukay, Calatagan, Batangas

      Hukay GAA 2025 SSP 25DB0016

      Contract details
      Full description
      Convergence and Special Support Program - Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System - Construction of Water System in Barangay Hukay, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      GREENFIELD CONSTRUCTION, GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION)
      Bidders
      4
      Approved budget (ABC)
      ₱4,900,000
      Start
      19 February 2025
      Completion
      7 August 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,750,550
    • Construction of Road, Barangay Tanagan, Calatagan, Batangas

      Tanagan GAA 2025 SSP 25DB0051

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Barangay Tanagan, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      S-ANG CONSTRUCTION & GENERAL TRADING, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱138,600,000
      Start
      18 February 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status On-Going · 100% Budget ₱134,441,704
    • Construction of Road, Barangay Biga, Calatagan, Batangas

      Biga GAA 2025 SSP 25DB0052

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Barangay Biga, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      S-ANG CONSTRUCTION & GENERAL TRADING, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱138,600,000
      Start
      18 February 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status On-Going · 53.03% Budget ₱134,441,858
    • Construction (Completion) of Multi-Purpose Building in Barangay Tanagan, Calatagan, Batangas

      Tanagan GAA 2025 SSP 25DB0055

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction (Completion) of Multi-Purpose Building in Barangay Tanagan, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱2,970,000
      Start
      3 March 2025
      Completion
      15 June 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱2,879,400
    • Construction (Completion) of Multi-Purpose Building (Health Center) in Barangay Balibago, Calatagan, Batangas

      Balibago Buildings and Facilities 25DB0065

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction (Completion) of Multi-Purpose Building (Health Center) in Barangay Balibago, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      19 February 2025
      Completion
      19 May 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱1,919,500
    • Rehabilitation of Multi-Purpose Building in Calatagan, Batangas

      Buildings and Facilities 25DB0068

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Rehabilitation of Multi-Purpose Building in Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SANDSTORM CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      21 February 2025
      Completion
      20 July 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,801,500
    • Construction (Completion) of Multi-Purpose Building in Barangay 1 , Calatagan, Batangas

      Barangay 1 (Pob.) GAA 2025 SSP 25DB0082

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction (Completion) of Multi-Purpose Building in Barangay 1 , Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      RBG CONSTRUCTION SERVICES
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      21 February 2025
      Completion
      21 May 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱1,919,800
    • Construction (Completion) of Multi-Purpose Building in Barangay Sambungan, Calatagan, Batangas

      Sambungan Buildings and Facilities 25DB0083

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction (Completion) of Multi-Purpose Building in Barangay Sambungan, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SANDSTORM CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      21 February 2025
      Completion
      19 May 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱1,920,104
    • Construction of Road, Sitio Pagaspas Bay, Barangay 3,Calatagan,Batangas

      Barangay 3 (Pob.) GAA 2025 SSP 25DB0098

      Contract details
      Full description
      Convergence and Special Support Prog-Basic Infrastructure Program (BIP) - Access Rds And/Or Bridges from the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Sitio Pagaspas Bay, Barangay 3,Calatagan,Batangas
      Type
      GAA 2025 SSP
      Contractor
      MATRICS CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      18 February 2025
      Completion
      17 June 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱9,751,500
    • Construction of Road at Barangay. Santa Ana, Calatagan, Batangas

      Santa Ana GAA 2025 SSP 25DB0125

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Roads Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road at Barangay. Santa Ana, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      2 June 2025
      Completion
      30 August 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,801,500
    • Construction of Road at Barangay Qulitisan, Calatagan, Batangas

      Quilitisan GAA 2025 SSP 25DB0134

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Roads Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road at Barangay Qulitisan, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      CON CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      7 July 2025
      Completion
      26 September 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,801,457
    • Construction of Road at Brgy. Tanagan, Calatagan, Batangas

      Tanagan GAA 2025 SSP 25DB0136

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Roads Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road at Brgy. Tanagan, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      2 June 2025
      Completion
      2 November 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱9,751,500
    • Construction of Barangay Road at Brgy. 4, Calatagan, Batangas

      Barangay 4 (Pob.) GAA 2025 SSP 25DB0137

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Roads Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Barangay Road at Brgy. 4, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP
      Bidders
      3
      Approved budget (ABC)
      ₱2,970,000
      Start
      2 June 2025
      Completion
      15 August 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱2,880,900
    • Construction of Barangay Road Brgy. Gulod, Calatagan, Batangas

      Gulod GAA 2025 SSP 25DB0138

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Roads Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Barangay Road Brgy. Gulod, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      2 June 2025
      Completion
      30 August 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱1,920,600
    • Construction of Road including Drainage Structure at Barangay 3,Calatagan,Batangas

      Barangay 3 (Pob.) GAA 2025 SSP 25DB0146

      Contract details
      Full description
      Convergence& Special Support Prog-Basic Infra Prog (BIP) - Access Roads And/Or Bridges from the National Roads Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road including Drainage Structure at Barangay 3,Calatagan,Batangas
      Type
      GAA 2025 SSP
      Contractor
      RUSMEN BUILDERS & DEVELOPMENT CORPORATION (FORMERL
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      2 June 2025
      Completion
      4 October 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,801,480
    • Construction of Road including Drainage Structure at Barangay Lucsuhin, Calatagan, Batangas

      Lucsuhin GAA 2025 SSP 25DB0147

      Contract details
      Full description
      Convergence & Special Support Prog - Basic Infra Prog (BIP) - Access Rds &/or Brs from the National Rds Leading to Maj/ Strategic Public Buildings/ Facilities - Construction of Road including Drainage Structure at Barangay Lucsuhin, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      RUSMEN BUILDERS & DEVELOPMENT CORPORATION (FORMERL
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      2 June 2025
      Completion
      4 October 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,801,480
    • Construction of Flood Control along Santiago River, Barangay Lucsuhin, Calatagan,Batangas

      Lucsuhin GAA 2025 SSP 25DB0151

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities - Construction of Flood Control along Santiago River, Barangay Lucsuhin, Calatagan,Batangas
      Type
      GAA 2025 SSP
      Contractor
      GROUND UP CONSTRUCTION AND SUPPLIES
      Bidders
      3
      Approved budget (ABC)
      ₱49,500,000
      Start
      9 June 2025
      Completion
      20 April 2026
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱48,766,600
    • Construction of Multi-Purpose Building, Brgy. Bucal, Calatagan, Batangas

      Bucal GAA 2025 SSP 25DB0159

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building, Brgy. Bucal, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      H ROCK CONST. INC. (FORMERLY: NCC CONSTRUCTION)
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      7 July 2025
      Completion
      3 December 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,801,635
    • Completion of Multi-Purpose Building, Brgy. Talisay, Calatagan, Batangas

      Talisay GAA 2025 SSP 25DB0160

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Completion of Multi-Purpose Building, Brgy. Talisay, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      L.P.O. ENTERPRISES
      Bidders
      3
      Approved budget (ABC)
      ₱3,960,000
      Start
      9 July 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status On-Going · 4.57% Budget ₱3,900,600
    • Completion of Multi-Purpose Building (Open Classroom) in Lucsuhin Elementary School, Brgy. Lucsuhin, Calatagan, Batangas

      Lucsuhin GAA 2025 SSP 25DB0161

      Contract details
      Full description
      Convergence & Special Support Prog- Basic Infrastructure Prog (BIP) -Multi-Purpose Buildings/ Facilities to Support Social Services - Completion of Multi-Purpose Building (Open Classroom) in Lucsuhin Elementary School, Brgy. Lucsuhin, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱2,970,000
      Start
      18 July 2025
      Completion
      15 December 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱2,880,000
    • Completion of Multi-Purpose Building at Barangay 2, Calatagan, Batangas

      Barangay 2 (Pob.) GAA 2025 SSP 25DB0167

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Completion of Multi-Purpose Building at Barangay 2, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      7 July 2025
      Completion
      24 October 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱1,920,624
    • Improvement of Multi-Purpose Building at Brgy. Balibago, Calatagan, Batangas

      Balibago GAA 2025 SSP 25DB0192

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Improvement of Multi-Purpose Building at Brgy. Balibago, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP
      Bidders
      3
      Approved budget (ABC)
      ₱6,930,000
      Start
      9 June 2025
      Completion
      26 November 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱6,722,100
    • Construction of Multi-Purpose Building at Barangay Lucsuhin, Calatagan, Batangas

      Lucsuhin GAA 2025 SSP 25DB0197

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building at Barangay Lucsuhin, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      MICLOVER GENERAL CONSTRUCTION & IRON WORKS
      Bidders
      3
      Approved budget (ABC)
      ₱19,800,000
      Start
      2 June 2025
      Completion
      10 March 2026
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱19,202,100
    • Construction of Public Water System at Barangay Luya, Calatagan, Batangas

      Luya GAA 2025 SSP 25DB0206

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Public Water Supply System - Construction of Public Water System at Barangay Luya, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      H ROCK CONST. INC. (FORMERLY: NCC CONSTRUCTION)
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      9 July 2025
      Completion
      5 December 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,801,499
    • Construction of Public Water System at Barangay Biga, Calatagan, Batangas

      Biga GAA 2025 SSP 25DB0207

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Public Water Supply System - Construction of Public Water System at Barangay Biga, Calatagan, Batangas
      Type
      GAA 2025 SSP
      Contractor
      SANDSTORM CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      9 July 2025
      Completion
      5 December 2025
      Source of funds
      Regular Infra - GAA 2025 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status Completed Budget ₱4,875,750
    • Concreting of Brgy. Sta. Ana FMR, Brgy. Sta. Ana, Calatagan, Batangas

      Santa Ana Roads 25DB0219

      Contract details
      Full description
      Concreting of Brgy. Sta. Ana FMR, Brgy. Sta. Ana, Calatagan, Batangas
      Type
      Roads
      Bidders
      3
      Approved budget (ABC)
      ₱14,925,000
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status For Procurement Budget Not yet listed
    • Repair/Rehabilitation of Classrooms in Talisay Elementary School, Calatagan, Batangas

      Talisay Buildings 25DB0224

      Contract details
      Full description
      Repair/Rehabilitation of Classrooms in Talisay Elementary School, Calatagan, Batangas
      Type
      Buildings: Repair
      Bidders
      0
      Approved budget (ABC)
      ₱2,537,250
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2025 Status For Procurement Budget Not yet listed
    • KATUPARAN) Access Road Leading to Calatagan Port, Calatagan, Batangas

      GAA 2024 CP 24D00002

      Contract details
      Full description
      Construction / Improvement of Access Roads Leading to Seaports (Kalsada Tungo Sa Paliparan, Riles at Daungan Program - KATUPARAN) Access Road Leading to Calatagan Port, Calatagan, Batangas
      Type
      GAA 2024 CP
      Contractor
      L.P.O. ENTERPRISES
      Bidders
      2
      Approved budget (ABC)
      ₱19,300,000
      Start
      28 February 2024
      Source of funds
      Regular Infra - GAA 2024 CP
      Implementing office
      DPWH Region IV-A
      Record
      This contract on BetterGov Transparency
      Year2024 Status On-Going · 81.15% Budget ₱19,299,707
    • Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay 1, Calatagan, Batangas

      Barangay 1 (Pob.) Buildings and Facilities 24DB0030

      Contract details
      Full description
      Convergence and Special Support Program-Basic Infrastructure Program (BIP)- Multi-Purpose Buildings/ Facilities to Support Social Services-Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay 1, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SANDSTORM CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      10 June 2024
      Completion
      11 September 2024
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱1,980,000
    • Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Bagong Silang, Calatagan, Batangas

      Bagong Silang Buildings and Facilities 24DB0032

      Contract details
      Full description
      Convergence and Special Support Program-Basic Infrastructure Program (BIP)- Multi-Purpose Buildings/ Facilities to Support Social Services-Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Bagong Silang, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2024
      Completion
      3 July 2024
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱1,980,000
    • Construction of Multi-Purpose Building (Barangay Hall), Barangay Real, Calatagan, Batangas

      Real Buildings and Facilities 24DB0045

      Contract details
      Full description
      Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP)- Multi-Purpose Buildings/ Facilities to Support Social Services-Construction of Multi-Purpose Building (Barangay Hall), Barangay Real, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      19 February 2024
      Completion
      29 September 2024
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱4,950,000
    • Rehabilitation of Talisay-Biga Road, Calatagan, Batangas

      BigaTalisay GAA 2024 SSP 24DB0086

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Road And/Or Bridges from National Road/S Leading to Major/Strategic Public Bldgs/ Facilities - Rehabilitation of Talisay-Biga Road, Calatagan, Batangas
      Type
      GAA 2024 SSP
      Contractor
      LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)
      Bidders
      4
      Approved budget (ABC)
      ₱79,200,000
      Start
      2 September 2024
      Completion
      7 July 2025
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱79,200,000
    • Construction (Completion) of Road, Brgy. Paraiso-Luya, Calatagan, Batangas

      LuyaParaiso Roads 24DB0097

      Contract details
      Full description
      Convergence and Special Support Prog-Basic Infrastructure Prog (BIP)- Access Roads And/Or Bridges from the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities- Construction (Completion) of Road, Brgy. Paraiso-Luya, Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱19,800,000
      Start
      9 August 2024
      Completion
      13 November 2024
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱19,800,000
    • Concreting of Road, Brgy. 1, 2, 3 and 4, Calatagan, Batangas

      Barangay 1 (Pob.)Barangay 2 (Pob.)Barangay 3 (Pob.)Barangay 4 (Pob.) Roads 24DB0100

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads And/Or Bridges from the National Road/S Leading to Major/Strategic Public Buildings/ Facilities - Concreting of Road, Brgy. 1, 2, 3 and 4, Calatagan, Batangas
      Type
      Roads
      Contractor
      X.Y.Z. CONSTRUCTION & SUPPLIES
      Bidders
      3
      Approved budget (ABC)
      ₱14,850,000
      Start
      24 April 2024
      Completion
      31 August 2024
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱14,850,000
    • Construction of Road, Brgy. 2, Calatagan, Batangas

      Barangay 2 (Pob.) Roads 24DB0103

      Contract details
      Full description
      Convergence and Special Support Program-Basic Infrastructure Program (BIP)- Access Roads And/Or Bridges from the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities- Construction of Road, Brgy. 2, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      5 April 2024
      Completion
      3 July 2024
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱4,950,000
    • Construction of the Multi-Purpose Building, Barangay 4, Calatagan, Batangas

      Barangay 4 (Pob.) Buildings and Facilities 24DB0112

      Contract details
      Full description
      Convergence and Special Support Program -Basic Infrastructure Program (BIP)- Multi-Purpose Buildings/ Facilities to Support Social Services- Construction of the Multi-Purpose Building, Barangay 4, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP
      Bidders
      3
      Approved budget (ABC)
      ₱19,800,000
      Start
      1 October 2024
      Completion
      15 June 2025
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱19,800,000
    • Construction of Multi-Purpose Building, Brgy. Lucsuhin, Calatagan, Batangas

      Lucsuhin GAA 2024 SSP 24DB0115

      Contract details
      Full description
      Convergence and Special Support Program -Basic Infrastructure Program (BIP)- Multi-Purpose Buildings/ Facilities to Support Social Services- Construction of Multi-Purpose Building, Brgy. Lucsuhin, Calatagan, Batangas
      Type
      GAA 2024 SSP
      Contractor
      MICLOVER GENERAL CONSTRUCTION & IRON WORKS
      Bidders
      3
      Approved budget (ABC)
      ₱29,700,000
      Start
      16 September 2024
      Completion
      13 August 2025
      Source of funds
      Regular Infra - GAA 2024 SSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱29,700,000
    • Concreting of Brgy. Balitoc FMR. Brgy. Balitoc, Calatagan, Batangas

      Balitoc Roads 24DB0132

      Contract details
      Full description
      Concreting of Brgy. Balitoc FMR. Brgy. Balitoc, Calatagan, Batangas
      Type
      Roads
      Contractor
      TRIDENT PEAKS BUILDERS & SERVICES INC.
      Bidders
      3
      Approved budget (ABC)
      ₱9,950,000
      Start
      27 August 2024
      Completion
      24 December 2024
      Source of funds
      Outside Infra - GAA 2024 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱9,950,000
    • Concreting of Brgy. Quilitisan FMR, Brgy. Quilitisan, Calatagan, Batangas

      Quilitisan Roads 24DB0136

      Contract details
      Full description
      Concreting of Brgy. Quilitisan FMR, Brgy. Quilitisan, Calatagan, Batangas
      Type
      Roads
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱14,925,000
      Start
      7 August 2024
      Completion
      20 January 2025
      Source of funds
      Outside Infra - GAA 2024 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱14,925,000
    • Concreting of Barangay Gulod FMR, Barangay Gulod, Calatagan, Batangas

      Gulod Trust Funds 2024 24DB0155

      Contract details
      Full description
      Concreting of Barangay Gulod FMR, Barangay Gulod, Calatagan, Batangas
      Type
      Trust Funds 2024
      Contractor
      POWER K CONSTRUCTION SUPPLY & SERVICES
      Bidders
      3
      Approved budget (ABC)
      ₱14,925,000
      Start
      5 June 2025
      Completion
      26 December 2025
      Source of funds
      Outside Infra - Trust Funds 2024
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2024 Status Completed Budget ₱14,469,700
    • KATUPARAN) Access Road Leading to Calatagan Port, Calatagan, Batangas

      GAA 2023 CSSP 23D00055

      Contract details
      Full description
      Construction / Improvement of Access Roads Leading to Seaports (Kalsada Tungo Sa Paliparan, Riles at Daungan Program - KATUPARAN) Access Road Leading to Calatagan Port, Calatagan, Batangas
      Type
      GAA 2023 CSSP
      Contractor
      EIGHT J'S CONSTRUCTION SERVICES
      Bidders
      3
      Approved budget (ABC)
      ₱52,110,000
      Start
      5 June 2023
      Completion
      24 September 2024
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Region IV-A
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱52,109,803
    • Construction(Completion) of Multi-Purpose Building(2/F and Existing Stage Connecting 2 Buildings),Barangay Talisay, Calatagan

      Talisay Buildings and Facilities 23DB0027

      Contract details
      Full description
      Convergence and Special Support Program-Basic Infrastructure Program-Mpbs/Facilities to Support Social Services- Construction(Completion) of Multi-Purpose Building(2/F and Existing Stage Connecting 2 Buildings),Barangay Talisay, Calatagan
      Type
      Buildings and Facilities
      Contractor
      H ROCK CONST. INC. (FORMERLY: NCC CONSTRUCTION)
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      19 May 2023
      Completion
      21 August 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱1,980,000
    • Construction of Road, Barangay Sambungan, Calatagan, Batangas

      Sambungan Roads 23DB0051

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Access Roads And/Or Bridges from the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities -Construction of Road, Barangay Sambungan, Calatagan, Batangas
      Type
      Roads
      Contractor
      FE S. REYES GENERAL CONTRACTOR CORP.
      Bidders
      3
      Approved budget (ABC)
      ₱4,948,760
      Start
      7 February 2023
      Completion
      7 May 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱4,948,760
    • Construction (Completion) of Multi-Purpose Building, Barangay Balibago,Calatagan, Batangas

      Balibago GAA 2023 CSSP 23DB0062

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to Support Social Services -Construction (Completion) of Multi-Purpose Building, Barangay Balibago,Calatagan, Batangas
      Type
      GAA 2023 CSSP
      Contractor
      GREENFIELD CONSTRUCTION, GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION)
      Bidders
      4
      Approved budget (ABC)
      ₱1,980,000
      Start
      7 August 2023
      Completion
      5 November 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱1,920,163
    • Construction (Completion) of Multi-Purpose Building, Barangay Luya, Calatagan, Batangas

      Luya Buildings and Facilities 23DB0063

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to Support Social Services -Construction (Completion) of Multi-Purpose Building, Barangay Luya, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      NIDA BUILDER'S & SUPPLIES
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      7 February 2023
      Completion
      6 June 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱4,950,000
    • Construction of Road, Brgy. Lucsuhin, Calatagan, Batangas

      Lucsuhin Roads 23DB0112

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Access Roads And/Or Bridges from the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Brgy. Lucsuhin, Calatagan, Batangas
      Type
      Roads
      Contractor
      W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS)
      Bidders
      3
      Approved budget (ABC)
      ₱9,898,760
      Start
      24 March 2023
      Completion
      21 June 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱9,898,760
    • Completion of Multi-Purpose Building (Covered Court) in Brgy. Hukay, Calatagan, Batangas

      Hukay Buildings and Facilities 23DB0122

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to Support Social Services - Completion of Multi-Purpose Building (Covered Court) in Brgy. Hukay, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      19 April 2023
      Completion
      31 May 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱1,980,000
    • Completion of Multi-Purpose Building, Calatagan Senior High School, Brgy. 2, Calatagan, Batangas

      Barangay 2 (Pob.) Buildings and Facilities 23DB0129

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to Support Social Services - Completion of Multi-Purpose Building, Calatagan Senior High School, Brgy. 2, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      25 August 2023
      Completion
      9 February 2024
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱4,950,000
    • Construction of Multi-Purpose Building, Brgy. Balibago, Calatagan, Batangas

      Balibago Buildings and Facilities 23DB0130

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building, Brgy. Balibago, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      14 August 2023
      Completion
      11 November 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱4,950,000
    • Construction of Multi-Purpose Building, Brgy. Hukay, Calatagan, Batangas

      Hukay Buildings and Facilities 23DB0131

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building, Brgy. Hukay, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      25 August 2023
      Completion
      21 January 2024
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱4,950,000
    • Construction of Multi-Purpose Building, Brgy. Paraiso, Calatagan, Batangas

      Paraiso Buildings and Facilities 23DB0136

      Contract details
      Full description
      Convergence and Special Support Program - Basic Infrastructure Program - Multi-Purpose Buildings/ Facilities to Support Social Services - Construction of Multi-Purpose Building, Brgy. Paraiso, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SANDSTORM CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      15 June 2023
      Completion
      5 October 2023
      Source of funds
      Regular Infra - GAA 2023 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱4,801,680
    • Concreting of Brgy. Sambungan FMR, Brgy. Sambungan, Calatagan, Batangas

      Sambungan Roads 23DB0144

      Contract details
      Full description
      Concreting of Brgy. Sambungan FMR, Brgy. Sambungan, Calatagan, Batangas
      Type
      Roads
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱11,940,000
      Start
      1 August 2023
      Completion
      26 February 2024
      Source of funds
      Outside Infra - GAA 2023 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱11,940,000
    • Concreting of Brgy. Poblacion 1 FMR, Brgy. Poblacion 1, Calatagan, Batangas

      Barangay 1 (Pob.) Roads 23DB0145

      Contract details
      Full description
      Concreting of Brgy. Poblacion 1 FMR, Brgy. Poblacion 1, Calatagan, Batangas
      Type
      Roads
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱11,940,000
      Start
      1 August 2023
      Completion
      28 December 2023
      Source of funds
      Outside Infra - GAA 2023 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱11,940,000
    • Construction of 2 Units 1STY2CL, Carlosa Elementary School, Calatagan, Batangas

      Carlosa Buildings and Facilities 23DB0152

      Contract details
      Full description
      Construction of 2 Units 1STY2CL, Carlosa Elementary School, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SANDSTORM CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱10,000,000
      Start
      21 September 2023
      Completion
      13 March 2024
      Source of funds
      Outside Infra - GAA 2023 DepEd BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱10,000,000
    • Construction of 2 Units 1STY2CL, Carlosa Elementary School, Calatagan, Batangas

      Carlosa Buildings and Facilities 23DB0153

      Contract details
      Full description
      Construction of 2 Units 1STY2CL, Carlosa Elementary School, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SANDSTORM CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱10,000,000
      Start
      27 September 2023
      Completion
      28 April 2024
      Source of funds
      Outside Infra - GAA 2023 DepEd BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2023 Status Completed Budget ₱10,000,000
    • Access Road Leading to Calatagan Port, Calatagan, Batangas

      Roads 22D00003

      Contract details
      Full description
      Access Road Leading to Calatagan Port, Calatagan, Batangas
      Type
      Roads
      Contractor
      ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP.
      Bidders
      3
      Approved budget (ABC)
      ₱37,927,725
      Start
      1 March 2022
      Completion
      14 June 2023
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Region IV-A
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱37,926,746
    • Construction of Road in Calatagan, Batangas

      Roads 22DB0038

      Contract details
      Full description
      Construction of Road in Calatagan, Batangas
      Type
      Roads
      Contractor
      H ROCK CONST. INC. (FORMERLY: NCC CONSTRUCTION)
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      11 February 2022
      Completion
      10 July 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱4,801,500
    • Construction of Road with Canal in Barangay Poblacion 4, Calatagan, Batangas

      Barangay 4 (Pob.) Roads 22DB0043

      Contract details
      Full description
      Construction of Road with Canal in Barangay Poblacion 4, Calatagan, Batangas
      Type
      Roads
      Contractor
      W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS)
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      11 February 2022
      Completion
      11 May 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱4,950,000
    • Construction of Multi-Purpose Building in Barangay Balibago, Calatagan, Batangas

      Balibago Buildings and Facilities 22DB0071

      Contract details
      Full description
      Construction of Multi-Purpose Building in Barangay Balibago, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS)
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      18 March 2022
      Completion
      15 July 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱4,796,550
    • Construction of Multi-Purpose Building in Barangay Quilitisan, Calatagan, Batangas

      Quilitisan Buildings and Facilities 22DB0073

      Contract details
      Full description
      Construction of Multi-Purpose Building in Barangay Quilitisan, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      MICLOVER GENERAL CONSTRUCTION & IRON WORKS
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      11 February 2022
      Completion
      10 March 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱4,950,000
    • Construction of Public Water Supply System in Calatagan, Batangas

      Water Provision and Storage 22DB0081

      Contract details
      Full description
      Construction of Public Water Supply System in Calatagan, Batangas
      Type
      Water Provision and Storage
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      11 February 2022
      Completion
      11 May 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱4,802,769
    • Construction of Water Supply System in Barangay Luya, Calatagan, Batangas

      Luya Water Provision and Storage 22DB0083

      Contract details
      Full description
      Construction of Water Supply System in Barangay Luya, Calatagan, Batangas
      Type
      Water Provision and Storage
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      11 February 2022
      Completion
      10 July 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱4,801,062
    • Construction of Road, Barangay Bagong Silang, Calatagan, Batangas

      Bagong Silang Roads 22DB0117

      Contract details
      Full description
      Construction of Road, Barangay Bagong Silang, Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      28 March 2022
      Completion
      20 July 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱9,602,885
    • Construction of Road, Barangay Balibago, Calatagan, Batangas

      Balibago Roads 22DB0118

      Contract details
      Full description
      Construction of Road, Barangay Balibago, Calatagan, Batangas
      Type
      Roads
      Contractor
      X.Y.Z. CONSTRUCTION & SUPPLIES
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      28 March 2022
      Completion
      23 October 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱9,900,000
    • Construction of Road, Barangay Gulod, Calatagan, Batangas

      Gulod Roads 22DB0121

      Contract details
      Full description
      Construction of Road, Barangay Gulod, Calatagan, Batangas
      Type
      Roads
      Contractor
      X.Y.Z. CONSTRUCTION & SUPPLIES
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      28 March 2022
      Completion
      30 June 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱9,900,000
    • Construction (Completion) of Multi-Purpose Facility (Covered Court), Calatagan SHS (Phase II), Calatagan, Batangas, Calatagan, Batangas

      Buildings and Facilities 22DB0128

      Contract details
      Full description
      Construction (Completion) of Multi-Purpose Facility (Covered Court), Calatagan SHS (Phase II), Calatagan, Batangas, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      4
      Approved budget (ABC)
      ₱4,950,000
      Start
      27 May 2022
      Completion
      23 September 2022
      Source of funds
      Regular Infra - GAA 2022 CSSP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱4,950,000
    • Concreting of Brgy. Tanagan FMR, Brgy. Tanagan, Calatagan, Batangas

      Tanagan Roads 22DB0142

      Contract details
      Full description
      Concreting of Brgy. Tanagan FMR, Brgy. Tanagan, Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱11,938,760
      Start
      8 July 2022
      Completion
      4 December 2022
      Source of funds
      Outside Infra - GAA 2022 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱11,938,760
    • Concreting of Farm-To-Market Road in Brgy. Carretonan, Calatagan, Batangas

      Carretunan Roads 22DB0172

      Contract details
      Full description
      Concreting of Farm-To-Market Road in Brgy. Carretonan, Calatagan, Batangas
      Type
      Roads
      Contractor
      V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL
      Bidders
      3
      Approved budget (ABC)
      ₱14,662,500
      Start
      6 October 2023
      Completion
      16 December 2023
      Source of funds
      Outside Infra - Trust Funds 2022
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2022 Status Completed Budget ₱14,662,500
    • Fy 2021 DPWH Infrastructure Program Convergence and Special Support Program Construction / Improvement of Access Roads Leading to Seaports Access Road Leading to Calatagan Port, Calatagan, Batangas

      Roads 21D00073

      Contract details
      Full description
      Fy 2021 DPWH Infrastructure Program Convergence and Special Support Program Construction / Improvement of Access Roads Leading to Seaports Access Road Leading to Calatagan Port, Calatagan, Batangas
      Type
      Roads
      Contractor
      V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL
      Bidders
      8
      Approved budget (ABC)
      ₱68,834,415
      Start
      5 May 2021
      Completion
      12 December 2022
      Source of funds
      Regular Infra - GAA 2021 CSSP
      Implementing office
      DPWH Region IV-A
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱56,786,012
    • Construction of Multi-Purpose Building (Day Care Center) in Barangay Poblacion 1, Calatagan, Batangas

      Barangay 1 (Pob.) Buildings and Facilities 21DB0056

      Contract details
      Full description
      Construction of Multi-Purpose Building (Day Care Center) in Barangay Poblacion 1, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      11 February 2021
      Completion
      9 July 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱1,920,947
    • Construction of Multi-Purpose Building (Health Center) in Barangay Hukay, Calatagan, Batangas

      Hukay Buildings and Facilities 21DB0060

      Contract details
      Full description
      Construction of Multi-Purpose Building (Health Center) in Barangay Hukay, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      F. CASALME CONSTRUCTION & SUPPLY
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      11 February 2021
      Completion
      11 May 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱1,919,847
    • Concreting of Road at Barangay Lucsuhin, Calatagan, Batangas

      Lucsuhin Roads 21DB0093

      Contract details
      Full description
      Concreting of Road at Barangay Lucsuhin, Calatagan, Batangas
      Type
      Roads
      Contractor
      W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS)
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      22 April 2021
      Completion
      8 June 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱1,919,975
    • Concreting of Road in Barangay Sta. Ana, Calatagan, Batangas

      Santa Ana Roads 21DB0094

      Contract details
      Full description
      Concreting of Road in Barangay Sta. Ana, Calatagan, Batangas
      Type
      Roads
      Contractor
      W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS)
      Bidders
      3
      Approved budget (ABC)
      ₱2,970,000
      Start
      11 February 2021
      Completion
      21 April 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱2,873,397
    • Concreting of Road, Barangay Balibago, Calatagan, Batangas

      Balibago Roads 21DB0096

      Contract details
      Full description
      Concreting of Road, Barangay Balibago, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      25 March 2021
      Completion
      22 June 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱4,950,000
    • Concreting of Road, Barangay Carlosa, Calatagan, Batangas

      Carlosa GAA 2021 LP 21DB0098

      Contract details
      Full description
      Concreting of Road, Barangay Carlosa, Calatagan, Batangas
      Type
      GAA 2021 LP
      Contractor
      GREENFIELD CONSTRUCTION, GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION)
      Bidders
      4
      Approved budget (ABC)
      ₱2,970,000
      Start
      11 February 2021
      Completion
      26 April 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱2,894,827
    • Construction of Water System in Barangay Biga, Calatagan, Batangas

      Biga GAA 2021 LP 21DB0114

      Contract details
      Full description
      Construction of Water System in Barangay Biga, Calatagan, Batangas
      Type
      GAA 2021 LP
      Contractor
      GREENFIELD CONSTRUCTION, GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION)
      Bidders
      4
      Approved budget (ABC)
      ₱1,980,000
      Start
      11 February 2021
      Completion
      11 May 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱1,920,965
    • Construction (Completion) of Multi-Purpose Building (Barangay Hall) in Barangay Gulod, Calatagan, Batangas

      Gulod Buildings and Facilities 21DB0117

      Contract details
      Full description
      Construction (Completion) of Multi-Purpose Building (Barangay Hall) in Barangay Gulod, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱1,000,000
      Start
      25 March 2021
      Completion
      21 April 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱969,902
    • 1. Concreting of Road in Brgy. Quilitisan, Calatagan, Batangas 2. Concreting of Road in Brgy. Poblacion 3, Calatagan, Batangas

      Barangay 3 (Pob.)Quilitisan Roads 21DB0119

      Contract details
      Full description
      1. Concreting of Road in Brgy. Quilitisan, Calatagan, Batangas 2. Concreting of Road in Brgy. Poblacion 3, Calatagan, Batangas
      Type
      Roads
      Contractor
      FILCAN UNITED CONSTRUCTION & GENERAL MERCHANDISE CORP.
      Bidders
      3
      Approved budget (ABC)
      ₱2,000,000
      Start
      12 November 2021
      Completion
      10 January 2022
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱1,939,143
    • Concreting of Road 1. In Brgy. Bagong Silang 2. In Brgy. Balitoc 3. In Brgy. Real, Calatagan, Batangas

      Bagong SilangBalitocReal Roads 21DB0136

      Contract details
      Full description
      Concreting of Road 1. In Brgy. Bagong Silang 2. In Brgy. Balitoc 3. In Brgy. Real, Calatagan, Batangas
      Type
      Roads
      Contractor
      W. RIVERA CONST. AND EQUIPT. RENTALS, INC. (FORMERLY: W. RIVERA CONSTRUCTION & EQUIPMENT RENTALS)
      Bidders
      3
      Approved budget (ABC)
      ₱2,500,000
      Start
      12 November 2021
      Completion
      10 January 2022
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱2,434,937
    • Concreting of Road in Barangay Tanagan, Calatagan, Batangas

      Tanagan Roads 21DB0152

      Contract details
      Full description
      Concreting of Road in Barangay Tanagan, Calatagan, Batangas
      Type
      Roads
      Contractor
      FILCAN UNITED CONSTRUCTION & GENERAL MERCHANDISE CORP.
      Bidders
      3
      Approved budget (ABC)
      ₱1,000,000
      Start
      31 March 2021
      Completion
      14 May 2021
      Source of funds
      Regular Infra - GAA 2021 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱970,006
    • Concreting of Brgy. Sta. Ana FMR, Brgy. Sta. Ana, Calatagan, Batangas

      Santa Ana Roads 21DB0165

      Contract details
      Full description
      Concreting of Brgy. Sta. Ana FMR, Brgy. Sta. Ana, Calatagan, Batangas
      Type
      Roads
      Contractor
      TOPTECH TRADING AND CONSTRUCTION CO., INC.
      Bidders
      3
      Approved budget (ABC)
      ₱12,437,500
      Start
      23 September 2021
      Completion
      17 March 2022
      Source of funds
      Outside Infra - GAA 2021 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2021 Status Completed Budget ₱12,437,500
    • Bridge Program Widening of Permanent Bridges Talisay Br. (B00051LZ) along Nasugbu-Lian-Calatagan Rd, Calatagan, Batangas

      Talisay Bridges 20DB0026

      Contract details
      Full description
      Bridge Program Widening of Permanent Bridges Talisay Br. (B00051LZ) along Nasugbu-Lian-Calatagan Rd, Calatagan, Batangas
      Type
      Bridges
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      3
      Approved budget (ABC)
      ₱28,663,860
      Start
      24 February 2020
      Completion
      20 October 2020
      Source of funds
      Regular Infra - GAA 2020 OO-1
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱27,803,869
    • Construction (Completion) of Multi-Purpose Building, Brgy. Carlosa, Calatagan, Batangas

      Carlosa Buildings and Facilities 20DB0043

      Contract details
      Full description
      Construction (Completion) of Multi-Purpose Building, Brgy. Carlosa, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱2,968,860
      Start
      17 February 2020
      Completion
      15 June 2020
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱2,879,200
    • Construction of Multi-Purpose Building (Barangay Hall), Brgy. Gulod, Calatagan, Batangas

      Gulod Buildings and Facilities 20DB0073

      Contract details
      Full description
      Construction of Multi-Purpose Building (Barangay Hall), Brgy. Gulod, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱1,958,860
      Start
      16 October 2020
      Completion
      14 December 2020
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱1,900,280
    • Construction of Open Canal, Brgy. Lucsuhin, Calatagan, Batangas

      Lucsuhin Flood Control and Drainage 20DB0080

      Contract details
      Full description
      Construction of Open Canal, Brgy. Lucsuhin, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱998,860
      Start
      16 October 2020
      Completion
      14 December 2020
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱968,835
    • Concreting of Roads, Brgy. Poblacion 3, Calatagan, Batangas

      Barangay 3 (Pob.) Roads 20DB0087

      Contract details
      Full description
      Concreting of Roads, Brgy. Poblacion 3, Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱498,860
      Start
      16 October 2020
      Completion
      14 November 2020
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱483,857
    • Construction of Multi-Purpose Covered Court, Brgy. Talisay, Calatagan, Batangas-Phase II

      Talisay Buildings and Facilities 20DB0099

      Contract details
      Full description
      Construction of Multi-Purpose Covered Court, Brgy. Talisay, Calatagan, Batangas-Phase II
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱2,970,000
      Start
      16 October 2020
      Completion
      14 December 2020
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱2,881,180
    • Construction of Multi-Purpose Covered Court, Brgy. Gulod, Calatagan, Batangas-Phase II

      Gulod Buildings and Facilities 20DB0100

      Contract details
      Full description
      Construction of Multi-Purpose Covered Court, Brgy. Gulod, Calatagan, Batangas-Phase II
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱2,970,000
      Start
      16 October 2020
      Completion
      14 December 2020
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱2,879,300
    • Construction of Multi-Purpose Covered Court, Senior High School in Calatagan, Poblacion II, Calatagan, Batangas

      Barangay 2 (Pob.) Buildings and Facilities 20DB0101

      Contract details
      Full description
      Construction of Multi-Purpose Covered Court, Senior High School in Calatagan, Poblacion II, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱2,968,860
      Start
      16 October 2020
      Completion
      12 February 2021
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱2,878,200
    • Concreting of Local Road, Brgy. Poblacion IV, Calatagan, Batangas

      Barangay 4 (Pob.) GAA 2020 LP 20DB0122

      Contract details
      Full description
      Concreting of Local Road, Brgy. Poblacion IV, Calatagan, Batangas
      Type
      GAA 2020 LP
      Contractor
      GREENFIELD CONSTRUCTION, GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION)
      Bidders
      4
      Approved budget (ABC)
      ₱9,898,860
      Start
      7 December 2020
      Completion
      22 March 2021
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱9,898,860
    • Concreting of Road, Brgy. Biga, Calatagan, Batangas

      Biga Roads 20DB0127

      Contract details
      Full description
      Concreting of Road, Brgy. Biga, Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,948,860
      Start
      16 October 2020
      Completion
      13 January 2021
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱4,799,269
    • Construction of Water System, Brgy. Talisay, Calatagan, Batangas

      Talisay Water Provision and Storage 20DB0131

      Contract details
      Full description
      Construction of Water System, Brgy. Talisay, Calatagan, Batangas
      Type
      Water Provision and Storage
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱1,958,860
      Start
      16 October 2020
      Completion
      14 December 2020
      Source of funds
      Regular Infra - GAA 2020 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱1,899,976
    • Concreting of Brgy. Tanagan FMR, Brgy. Tanagan, Calatagan, Batangas

      Tanagan Roads 20DB0140

      Contract details
      Full description
      Concreting of Brgy. Tanagan FMR, Brgy. Tanagan, Calatagan, Batangas
      Type
      Roads
      Contractor
      RUSMEN BUILDERS & DEVELOPMENT CORPORATION (FORMERL
      Bidders
      3
      Approved budget (ABC)
      ₱12,935,000
      Start
      23 September 2020
      Completion
      4 December 2020
      Source of funds
      Outside Infra - GAA 2020 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2020 Status Completed Budget ₱12,868,860
    • Construction of Barangay Hall (Multi-Purpose Building) in Brgy. Poblacion 2, Calatagan, Batangas

      Barangay 2 (Pob.) Buildings and Facilities 19DB0026

      Contract details
      Full description
      Construction of Barangay Hall (Multi-Purpose Building) in Brgy. Poblacion 2, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SUPPLICON BUILDERS
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      16 June 2019
      Completion
      14 August 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱980,326
    • Construction of Multi-Purpose Building (Covered Court), Brgy. Carlosa, Calatagan, Batangas

      Carlosa Buildings and Facilities 19DB0037

      Contract details
      Full description
      Construction of Multi-Purpose Building (Covered Court), Brgy. Carlosa, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱3,960,000
      Start
      10 June 2019
      Completion
      30 September 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱3,860,970
    • Construction of Multi-Purpose Building (Covered Court), Brgy. Carretonan, Calatagan, Batangas

      Carretunan Buildings and Facilities 19DB0040

      Contract details
      Full description
      Construction of Multi-Purpose Building (Covered Court), Brgy. Carretonan, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱3,960,000
      Start
      22 July 2019
      Completion
      4 November 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱3,861,000
    • Repair of Barangay Hall (Multi-Purpose Building), Brgy. Bagong Silang, Calatagan, Batangas

      Bagong Silang Buildings and Facilities 19DB0055

      Contract details
      Full description
      Repair of Barangay Hall (Multi-Purpose Building), Brgy. Bagong Silang, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SUPPLICON BUILDERS
      Bidders
      3
      Approved budget (ABC)
      ₱1,000,000
      Start
      16 June 2019
      Completion
      30 September 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱970,912
    • Repair of Multi-Purpose Building (Stage) Encarnacion Elementary School, Brgy. Encarnacion, Calatagan, Batangas

      Encarnacion Buildings and Facilities 19DB0056

      Contract details
      Full description
      Repair of Multi-Purpose Building (Stage) Encarnacion Elementary School, Brgy. Encarnacion, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SUPPLICON BUILDERS
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      18 July 2019
      Completion
      27 September 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱979,457
    • Concreting of Road, Barangay Tanagan, Calatagan, Batangas

      Tanagan Roads 19DB0059

      Contract details
      Full description
      Concreting of Road, Barangay Tanagan, Calatagan, Batangas
      Type
      Roads
      Contractor
      ARLKAYE BUILDERS
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      16 June 2019
      Completion
      31 July 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱1,938,078
    • Concreting of Road, Calatagan, Batangas

      Roads 19DB0061

      Contract details
      Full description
      Concreting of Road, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱3,465,000
      Start
      16 June 2019
      Completion
      25 July 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱3,360,968
    • Construction/Rehabilitation of Road including Drainage Facilities, Poblacion 4, Calatagan, Batangas

      Barangay 4 (Pob.) Roads 19DB0066

      Contract details
      Full description
      Construction/Rehabilitation of Road including Drainage Facilities, Poblacion 4, Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      16 June 2019
      Completion
      14 August 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱1,930,505
    • Construction of Drainage System in Poblacion I, II, III, IV, Calatagan, Batangas

      Barangay 1 (Pob.)Barangay 2 (Pob.)Barangay 3 (Pob.)Barangay 4 (Pob.) Flood Control and Drainage 19DB0121

      Contract details
      Full description
      Construction of Drainage System in Poblacion I, II, III, IV, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      TRISTAN TEJADA CONSTRUCTION (FORMERLY: JOMATRIS CO
      Bidders
      3
      Approved budget (ABC)
      ₱14,700,000
      Start
      29 July 2019
      Completion
      10 December 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱14,333,081
    • Concreting of Road, Brgy. Sta. Ana, Calatagan, Batangas

      Santa Ana Roads 19DB0124

      Contract details
      Full description
      Concreting of Road, Brgy. Sta. Ana, Calatagan, Batangas
      Type
      Roads
      Contractor
      TRISTAN TEJADA CONSTRUCTION (FORMERLY: JOMATRIS CO
      Bidders
      3
      Approved budget (ABC)
      ₱14,698,860
      Start
      29 July 2019
      Completion
      25 November 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱14,332,021
    • Construction and Rehabilitation of Multi-Purpose Hall, Paraiso, Calatagan, Batangas

      Paraiso Buildings and Facilities 19DB0135

      Contract details
      Full description
      Construction and Rehabilitation of Multi-Purpose Hall, Paraiso, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱2,968,860
      Start
      14 August 2019
      Completion
      11 December 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱2,879,790
    • Construction of MPB in Paraiso Elementary School, Calatagan, Batangas

      Paraiso Buildings and Facilities 19DB0136

      Contract details
      Full description
      Construction of MPB in Paraiso Elementary School, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      ARLKAYE BUILDERS
      Bidders
      3
      Approved budget (ABC)
      ₱2,968,860
      Start
      22 August 2019
      Completion
      9 December 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱2,885,805
    • Construction of Covered Court, Brgy. Gulod, Calatagan, Batangas

      Gulod Buildings and Facilities 19DB0140

      Contract details
      Full description
      Construction of Covered Court, Brgy. Gulod, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱2,968,860
      Start
      23 September 2019
      Completion
      15 March 2020
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱2,876,945
    • Construction of Covered Court, Brgy. Talisay, Calatagan, Batangas

      Talisay Buildings and Facilities 19DB0141

      Contract details
      Full description
      Construction of Covered Court, Brgy. Talisay, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      ARLKAYE BUILDERS
      Bidders
      3
      Approved budget (ABC)
      ₱2,968,860
      Start
      1 August 2019
      Completion
      25 October 2019
      Source of funds
      Regular Infra - GAA 2019 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱2,968,860
    • Concreting of Brgy. Biga FMR, Brgy. Biga, Calatagan, Batangas

      Biga Roads 19DB0151

      Contract details
      Full description
      Concreting of Brgy. Biga FMR, Brgy. Biga, Calatagan, Batangas
      Type
      Roads
      Contractor
      H ROCK CONST. INC. (FORMERLY: NCC CONSTRUCTION)
      Bidders
      3
      Approved budget (ABC)
      ₱4,973,860
      Start
      11 November 2019
      Completion
      9 March 2020
      Source of funds
      Outside Infra - GAA 2019 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2019 Status Completed Budget ₱4,973,860
    • Construction (Completion) of Multi-Purpose Building (Covered Court) Calatagan National High School, Brgy. Poblacion 1, Calatagan, Batangas

      Barangay 1 (Pob.) Buildings and Facilities 18DB0035

      Contract details
      Full description
      Construction (Completion) of Multi-Purpose Building (Covered Court) Calatagan National High School, Brgy. Poblacion 1, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      12 March 2018
      Completion
      10 April 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱964,972
    • Construction of Canal, Brgy. Lucsuhin, Calatagan, Batangas

      Lucsuhin Flood Control and Drainage 18DB0062

      Contract details
      Full description
      Construction of Canal, Brgy. Lucsuhin, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      GERSHLI CONSTRUCTION & SUPPLY
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      12 March 2018
      Completion
      25 April 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱973,750
    • Construction of Open Canal, Brgy. Poblacion 4, Calatagan, Batangas

      Barangay 4 (Pob.) Flood Control and Drainage 18DB0066

      Contract details
      Full description
      Construction of Open Canal, Brgy. Poblacion 4, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      GERSHLI CONSTRUCTION & SUPPLY
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      1 March 2018
      Completion
      14 April 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱973,900
    • Construction of Slope Protection, Brgy. Bucal, Calatagan, Batangas

      Bucal Flood Control and Drainage 18DB0067

      Contract details
      Full description
      Construction of Slope Protection, Brgy. Bucal, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      GERSHLI CONSTRUCTION & SUPPLY
      Bidders
      1
      Approved budget (ABC)
      ₱1,000,000
      Start
      8 March 2018
      Completion
      21 April 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱972,500
    • Concreting of Road in Calatagan, Batangas

      Roads 18DB0130

      Contract details
      Full description
      Concreting of Road in Calatagan, Batangas
      Type
      Roads
      Contractor
      SUPPLICON BUILDERS
      Bidders
      2
      Approved budget (ABC)
      ₱6,435,000
      Start
      29 April 2018
      Completion
      25 September 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱6,283,871
    • Construction of Drainage/Canal, Brgy. Lucsuhin, Calatagan, Batangas

      Lucsuhin Flood Control and Drainage 18DB0147

      Contract details
      Full description
      Construction of Drainage/Canal, Brgy. Lucsuhin, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      GERSHLI CONSTRUCTION & SUPPLY
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      29 April 2018
      Completion
      12 June 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱973,750
    • Repair/ Improvement of Multipurpose Building, (Barangay Hall), Brgy. Encarnacion, Calatagan, Batangas

      Encarnacion Buildings and Facilities 18DB0159

      Contract details
      Full description
      Repair/ Improvement of Multipurpose Building, (Barangay Hall), Brgy. Encarnacion, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      30 April 2018
      Completion
      28 June 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱978,268
    • Construction of Municipal Hall, Ayala St. Poblacion 2, Calatagan, Batangas

      Barangay 2 (Pob.) Buildings and Facilities 18DB0164

      Contract details
      Full description
      Construction of Municipal Hall, Ayala St. Poblacion 2, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      11 July 2018
      Completion
      17 October 2019
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱9,652,500
    • Repair/ Improvement of Barangay Hall, Brgy. Encarnation, Calatagan, Batangas

      Encarnacion Buildings and Facilities 18DB0165

      Contract details
      Full description
      Repair/ Improvement of Barangay Hall, Brgy. Encarnation, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      30 April 2018
      Completion
      28 July 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱978,268
    • Construction of Water System, Brgy. Bagong Silang, Calatagan, Batangas

      Bagong Silang GAA 2018 LP 18DB0169

      Contract details
      Full description
      Construction of Water System, Brgy. Bagong Silang, Calatagan, Batangas
      Type
      GAA 2018 LP
      Contractor
      GREENFIELD CONSTRUCTION, GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION)
      Bidders
      3
      Approved budget (ABC)
      ₱1,000,000
      Start
      29 April 2018
      Completion
      28 May 2018
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱978,580
    • Construction of a Retaining Wall at Poblacion Waterway, Calatagan, Batangas

      Flood Control and Drainage 18DB0180

      Contract details
      Full description
      Construction of a Retaining Wall at Poblacion Waterway, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      G.C.I. CONSTRUCTION AND DEV'T. CORP.
      Bidders
      2
      Approved budget (ABC)
      ₱49,500,000
      Start
      4 June 2018
      Completion
      31 July 2019
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱48,263,388
    • Construction of Concrete Bridge at Paraiso, Calatagan, Batangas

      Paraiso Bridges 18DB0182

      Contract details
      Full description
      Construction of Concrete Bridge at Paraiso, Calatagan, Batangas
      Type
      Bridges
      Contractor
      V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL
      Bidders
      2
      Approved budget (ABC)
      ₱29,700,000
      Start
      4 June 2018
      Completion
      17 October 2019
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱29,403,000
    • Construction of Bridge at Biga, Calatagan, Batangas

      Biga Bridges 18DB0183

      Contract details
      Full description
      Construction of Bridge at Biga, Calatagan, Batangas
      Type
      Bridges
      Contractor
      V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL
      Bidders
      1
      Approved budget (ABC)
      ₱19,800,000
      Start
      29 April 2018
      Completion
      17 October 2019
      Source of funds
      Regular Infra - GAA 2018 LP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱19,602,000
    • Construction and Completion of School Building Three (3) Storey Nine (9) Classroom at Jocobo Zobel ES (Calatagan ES) Calatagan, Batangas

      Buildings and Facilities 18DB0223

      Contract details
      Full description
      Construction and Completion of School Building Three (3) Storey Nine (9) Classroom at Jocobo Zobel ES (Calatagan ES) Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG
      Bidders
      2
      Approved budget (ABC)
      ₱24,415,357
      Start
      1 August 2018
      Completion
      7 December 2020
      Source of funds
      Outside Infra - GAA 2018 DepEd BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱24,115,411
    • Construction and Completion of School Building Four (4) Storey Sixteen (16) Classroom at SHS in Calatagan, Calatagan, Batangas

      Buildings and Facilities 18DB0227

      Contract details
      Full description
      Construction and Completion of School Building Four (4) Storey Sixteen (16) Classroom at SHS in Calatagan, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      MICLOVER GENERAL CONSTRUCTION & IRON WORKS
      Bidders
      2
      Approved budget (ABC)
      ₱36,726,184
      Start
      1 August 2018
      Completion
      11 June 2019
      Source of funds
      Outside Infra - GAA 2018 DepEd BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱36,726,184
    • Construction of Farm-To-Mill Road (FMR) Brgy. Lucsuhin to Brgy. Quilitisan, Calatagan, Batangas

      LucsuhinQuilitisan Roads 18DB0234

      Contract details
      Full description
      Construction of Farm-To-Mill Road (FMR) Brgy. Lucsuhin to Brgy. Quilitisan, Calatagan, Batangas
      Type
      Roads
      Contractor
      X.Y.Z. CONSTRUCTION & SUPPLIES
      Bidders
      3
      Approved budget (ABC)
      ₱13,243,005
      Start
      9 December 2018
      Completion
      7 April 2019
      Source of funds
      Outside Infra - SRA 2018 Farm-to-Mill Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱12,842,110
    • Construction of Four (4) Storey Sixteen (16) Classroom School Building at SHS in Calatagan, Calatagan, Batangas

      Buildings and Facilities 18DB0245

      Contract details
      Full description
      Construction of Four (4) Storey Sixteen (16) Classroom School Building at SHS in Calatagan, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      MICLOVER GENERAL CONSTRUCTION & IRON WORKS
      Bidders
      2
      Approved budget (ABC)
      ₱55,111,414
      Start
      9 January 2019
      Completion
      3 July 2019
      Source of funds
      Outside Infra - GAA 2018 DepEd BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2018 Status Completed Budget ₱54,281,775
    • Concreting of Roads, Calatagan, Batangas 1st LD, Brgy. Balitoc, Lucsuhin, Paraiso, Talisay, Carretonan, Sta. Ana & Talibayog, Calatagan, Batangas

      BalitocCarretunanLucsuhinParaisoSanta AnaTalibayogTalisay Roads 17DB0028

      Contract details
      Full description
      Concreting of Roads, Calatagan, Batangas 1st LD, Brgy. Balitoc, Lucsuhin, Paraiso, Talisay, Carretonan, Sta. Ana & Talibayog, Calatagan, Batangas
      Type
      Roads
      Contractor
      VRV CONSTRUCTION AND TRADING
      Bidders
      2
      Approved budget (ABC)
      ₱3,960,000
      Start
      16 February 2017
      Completion
      15 May 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱3,954,676
    • Concreting of Barangay Road, Biga, Calatagan, Batangas

      Biga Roads 17DB0059

      Contract details
      Full description
      Concreting of Barangay Road, Biga, Calatagan, Batangas
      Type
      Roads
      Contractor
      JESSAN CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      13 March 2017
      Completion
      10 June 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱9,502,613
    • Construction of Covered Court-Phase 2 at Calatagan National High School, Poblacion, Calatagan, Batangas

      Buildings and Facilities 17DB0062

      Contract details
      Full description
      Construction of Covered Court-Phase 2 at Calatagan National High School, Poblacion, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      23 March 2017
      Completion
      6 May 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱1,916,439
    • Concreting of Roads, Phase II, Calatagan, Batangas 1st LD

      Roads 17DB0071

      Contract details
      Full description
      Concreting of Roads, Phase II, Calatagan, Batangas 1st LD
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      13 April 2017
      Completion
      11 June 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱1,913,893
    • Concreting of Roads, Calatagan, Batangas

      Roads 17DB0074

      Contract details
      Full description
      Concreting of Roads, Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      13 April 2017
      Completion
      11 June 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱1,913,938
    • Concreting of Barangay Road in Barangay Paraiso, Calatagan, Batangas

      Paraiso Roads 17DB0077

      Contract details
      Full description
      Concreting of Barangay Road in Barangay Paraiso, Calatagan, Batangas
      Type
      Roads
      Contractor
      JESSAN CONSTRUCTION
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      10 May 2017
      Completion
      23 June 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱1,904,693
    • Concreting of Barangay Road, Paraiso, Calatagan, Batangas

      Paraiso Roads 17DB0078

      Contract details
      Full description
      Concreting of Barangay Road, Paraiso, Calatagan, Batangas
      Type
      Roads
      Contractor
      JESSAN CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      10 May 2017
      Completion
      7 August 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱9,502,760
    • Concreting of Sto. Domingo Street, Barangay Poblacion II, Calatagan, Batangas

      Barangay 2 (Pob.) Roads 17DB0085

      Contract details
      Full description
      Concreting of Sto. Domingo Street, Barangay Poblacion II, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱2,970,000
      Start
      9 May 2017
      Completion
      7 July 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱2,867,384
    • Rehabilitation of Lucsuhin-Duhatan Provincial Road, Calatagan, Batangas

      Lucsuhin Roads 17DB0088

      Contract details
      Full description
      Rehabilitation of Lucsuhin-Duhatan Provincial Road, Calatagan, Batangas
      Type
      Roads
      Contractor
      X.Y.Z. CONSTRUCTION & SUPPLIES
      Bidders
      2
      Approved budget (ABC)
      ₱4,900,000
      Start
      1 June 2017
      Completion
      18 September 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱4,701,873
    • Construction of Biga-Talisay Concrete Bridge, Calatagan, Batangas

      BigaTalisay Bridges 17DB0093

      Contract details
      Full description
      Construction of Biga-Talisay Concrete Bridge, Calatagan, Batangas
      Type
      Bridges
      Contractor
      JESSAN CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱14,850,000
      Start
      16 June 2017
      Completion
      11 January 2018
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱14,108,824
    • Concreting of Brgy. Biga FMR, Calatagan, Batangas

      Biga Roads 17DB0103

      Contract details
      Full description
      Concreting of Brgy. Biga FMR, Calatagan, Batangas
      Type
      Roads
      Contractor
      JESSAN CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱1,990,000
      Start
      10 September 2017
      Completion
      8 November 2017
      Source of funds
      Outside Infra - GAA 2017 DA FMR
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱1,910,389
    • Construction of Barangay Luya-Barangay Biga Local Road, Calatagan, Batangas

      BigaLuya Roads 17DB0117

      Contract details
      Full description
      Construction of Barangay Luya-Barangay Biga Local Road, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      17 July 2017
      Completion
      28 October 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱4,751,566
    • Improvement of Closed Canal along Apacible Street, Poblacion II, Calatagan, Batangas

      Barangay 2 (Pob.) Flood Control and Drainage 17DB0118

      Contract details
      Full description
      Improvement of Closed Canal along Apacible Street, Poblacion II, Calatagan, Batangas
      Type
      Flood Control and Drainage
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      17 July 2017
      Completion
      14 October 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱1,900,797
    • Construction of Multi-Purpose Covered Court at Barangay Biga, Calatagan, Batangas

      Biga Buildings and Facilities 17DB0121

      Contract details
      Full description
      Construction of Multi-Purpose Covered Court at Barangay Biga, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JESSAN CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      17 July 2017
      Completion
      13 November 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱4,750,448
    • Construction of Road at Balibago-Biga,Calatagan, Batangas

      BalibagoBiga Roads 17DB0124

      Contract details
      Full description
      Construction of Road at Balibago-Biga,Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱9,900,000
      Start
      2 August 2017
      Completion
      29 December 2017
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱9,499,915
    • Construction of Multi-Purpose Covered Court, Sta. Ana, Calatagan, Batangas

      Santa Ana Buildings and Facilities 17DB0127

      Contract details
      Full description
      Construction of Multi-Purpose Covered Court, Sta. Ana, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      ROMACON BUILDERS & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱4,950,000
      Start
      17 July 2017
      Completion
      13 January 2018
      Source of funds
      Regular Infra - GAA 2017 LFP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱4,950,000
    • Completion of 3 Sty 6 Cl at Lucsuhin NHS, Calatagan, Batangas

      Lucsuhin Buildings and Facilities 17DB0241

      Contract details
      Full description
      Completion of 3 Sty 6 Cl at Lucsuhin NHS, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      SUPPLICON BUILDERS
      Bidders
      2
      Approved budget (ABC)
      ₱4,733,899
      Start
      15 January 2018
      Completion
      14 May 2018
      Source of funds
      Outside Infra - GAA 2017 DepEd BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2017 Status Completed Budget ₱4,728,850
    • Concreting of Barangay Road in Brgy. Paraiso, Calatagan, Batangas

      Paraiso Roads 15DB0124

      Contract details
      Full description
      Concreting of Barangay Road in Brgy. Paraiso, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      31 January 2016
      Completion
      30 March 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,928,005
    • Concreting of Roads (Pob. 3, Brgy. Gulod, Brgy. Quilitisan, Brgy. Balibago) Calatagan, Batangas

      BalibagoGulodBarangay 3 (Pob.)Quilitisan Roads 15DB0126

      Contract details
      Full description
      Concreting of Roads (Pob. 3, Brgy. Gulod, Brgy. Quilitisan, Brgy. Balibago) Calatagan, Batangas
      Type
      Roads
      Contractor
      JUBER CONSTRUCTION
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      3 February 2016
      Completion
      18 March 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,933,194
    • Construction/Concreting of Brgy. Road Barangay Tanagan, Calatagan, Batangas

      Tanagan Roads 15DB0133

      Contract details
      Full description
      Construction/Concreting of Brgy. Road Barangay Tanagan, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱4,950,000
      Start
      3 February 2016
      Completion
      12 March 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱4,828,137
    • Construction of Multi-Purpose Building (Brgy. Hall) Talibayog, Calatagan, Batangas

      Talibayog Buildings and Facilities 15DB0134

      Contract details
      Full description
      Construction of Multi-Purpose Building (Brgy. Hall) Talibayog, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,000,000
      Start
      3 February 2016
      Completion
      2 April 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱979,963
    • Water Supply Project in Brgy. Paraiso, Calatagan, Batangas

      Paraiso Water Provision and Storage 15DB0150

      Contract details
      Full description
      Water Supply Project in Brgy. Paraiso, Calatagan, Batangas
      Type
      Water Provision and Storage
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      3 February 2016
      Completion
      2 April 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,928,210
    • Improvement of Roads including Drainage, (Pob. 2, Pob. 4) and Const./Rehab. Of Road, Brgy. Tanagan, All in Calatagan, Batangas

      Barangay 2 (Pob.)Barangay 4 (Pob.)Tanagan Flood Control/Hydraulics/Drainage, Roads 15DB0158

      Contract details
      Full description
      Improvement of Roads including Drainage, (Pob. 2, Pob. 4) and Const./Rehab. Of Road, Brgy. Tanagan, All in Calatagan, Batangas
      Type
      Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP
      Contractor
      SUPPLICON BUILDERS
      Bidders
      2
      Approved budget (ABC)
      ₱1,485,000
      Start
      3 February 2016
      Completion
      2 April 2016
      Source of funds
      Regular Infra - Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,482,900
    • Construction of Road (Interior) Brgy. Biga, Calatagan, Batangas

      Biga Roads 16DB0015

      Contract details
      Full description
      Construction of Road (Interior) Brgy. Biga, Calatagan, Batangas
      Type
      Roads
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      8 March 2016
      Completion
      6 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,932,766
    • Construction of Barangay Road, Barangay Baha, Calatagan, Batangas, 1st LD

      Baha Roads 16DB0016

      Contract details
      Full description
      Construction of Barangay Road, Barangay Baha, Calatagan, Batangas, 1st LD
      Type
      Roads
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      3
      Approved budget (ABC)
      ₱3,960,000
      Start
      8 March 2016
      Completion
      6 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱3,865,523
    • Construction of Road (Interior) Brgy. Paraiso, Calatagan, Batangas

      Paraiso Roads 16DB0020

      Contract details
      Full description
      Construction of Road (Interior) Brgy. Paraiso, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      8 March 2016
      Completion
      6 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,931,573
    • Construction of Multi-Purpose Building, Calatagan National High School, Calatagan, Batangas

      Buildings and Facilities 16DB0025

      Contract details
      Full description
      Construction of Multi-Purpose Building, Calatagan National High School, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱1,980,000
      Start
      10 March 2016
      Completion
      8 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,936,089
    • Extension of Multi-Purpose Building Structure (Brgy. Hall) Poblacion 1, Calatagan, Batangas

      Barangay 1 (Pob.) Buildings and Facilities 16DB0035

      Contract details
      Full description
      Extension of Multi-Purpose Building Structure (Brgy. Hall) Poblacion 1, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      JOMZKI CONSTRUCTION AND SUPPLY
      Bidders
      3
      Approved budget (ABC)
      ₱1,000,000
      Start
      18 March 2016
      Completion
      16 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱990,004
    • Construction of Multi-Purpose Building, Brgy. Paraiso, Calatagan, Batangas

      Paraiso Buildings and Facilities 16DB0036

      Contract details
      Full description
      Construction of Multi-Purpose Building, Brgy. Paraiso, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      18 March 2016
      Completion
      16 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,935,037
    • Construction of Water System Brgy. Biga, Calatagan, Batangas

      Biga Water Provision and Storage 16DB0041

      Contract details
      Full description
      Construction of Water System Brgy. Biga, Calatagan, Batangas
      Type
      Water Provision and Storage
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      18 March 2016
      Completion
      16 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,944,480
    • Construction of Water System Project in Paraiso, Calatagan, Batangas

      Paraiso Water Provision and Storage 16DB0044

      Contract details
      Full description
      Construction of Water System Project in Paraiso, Calatagan, Batangas
      Type
      Water Provision and Storage
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      18 March 2016
      Completion
      15 June 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,945,240
    • Construction of Multi-Purpose Building, Barangay Biga, Calatagan, Batangas

      Biga Buildings and Facilities 16DB0045

      Contract details
      Full description
      Construction of Multi-Purpose Building, Barangay Biga, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      18 March 2016
      Completion
      16 May 2016
      Source of funds
      Regular Infra - GAA 2016 Locally Funded Projects
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,944,911
    • Concreting of Brgy. Biga FMR, Brgy. Biga, Calatagan, Batangas

      Biga Roads 16DB0081

      Contract details
      Full description
      Concreting of Brgy. Biga FMR, Brgy. Biga, Calatagan, Batangas
      Type
      Roads
      Contractor
      F. CASALME CONSTRUCTION & SUPPLY
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,960,196
    • Concreting of Brgy. Baha FMR, Brgy. Baha, Calatagan, Batangas

      Baha Roads 16DB0082

      Contract details
      Full description
      Concreting of Brgy. Baha FMR, Brgy. Baha, Calatagan, Batangas
      Type
      Roads
      Contractor
      SUPPLICON BUILDERS
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,979,042
    • Concreting of Brgy. Encarnacion FMR, Brgy. Encarnacion, Calatagan, Batangas

      Encarnacion Roads 16DB0083

      Contract details
      Full description
      Concreting of Brgy. Encarnacion FMR, Brgy. Encarnacion, Calatagan, Batangas
      Type
      Roads
      Contractor
      SUPPLICON BUILDERS
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,978,996
    • Concreting of Brgy. Balibago FMR, Brgy. Balibago, Calatagan, Batangas

      Balibago Roads 16DB0084

      Contract details
      Full description
      Concreting of Brgy. Balibago FMR, Brgy. Balibago, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,950,298
    • Upgrading/Concreting of Brgy. Biga FMR, Brgy. Biga, Calatagan, Batangas

      Biga Roads 16DB0085

      Contract details
      Full description
      Upgrading/Concreting of Brgy. Biga FMR, Brgy. Biga, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,950,998
    • Concreting of Carlosa FMR, Barangay Carlosa, Calatagan, Batangas

      Carlosa Roads 16DB0088

      Contract details
      Full description
      Concreting of Carlosa FMR, Barangay Carlosa, Calatagan, Batangas
      Type
      Roads
      Contractor
      X.Y.Z. CONSTRUCTION & SUPPLIES
      Bidders
      2
      Approved budget (ABC)
      ₱4,950,000
      Start
      5 April 2016
      Completion
      3 July 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱4,900,165
    • Concreting of Brgy. Lucsuhin FMR, Brgy. Lucsuhin, Calatagan, Batangas

      Lucsuhin Roads 16DB0093

      Contract details
      Full description
      Concreting of Brgy. Lucsuhin FMR, Brgy. Lucsuhin, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱2,970,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱2,941,241
    • Concreting of Brgy. Poblacion III FMR, Brgy. Poblacion III, Calatagan, Batangas

      Barangay 3 (Pob.) Roads 16DB0094

      Contract details
      Full description
      Concreting of Brgy. Poblacion III FMR, Brgy. Poblacion III, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      3
      Approved budget (ABC)
      ₱2,970,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱2,938,755
    • Concreting of Brgy. Sta. Ana FMR, Brgy. Sta. Ana, Calatagan, Batangas

      Santa Ana Roads 16DB0095

      Contract details
      Full description
      Concreting of Brgy. Sta. Ana FMR, Brgy. Sta. Ana, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱2,970,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱2,930,885
    • Construction of Brgy. Balibago-Brgy. Biga FMR, Calatagan, Batangas

      BalibagoBiga Roads 16DB0096

      Contract details
      Full description
      Construction of Brgy. Balibago-Brgy. Biga FMR, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱16,830,000
      Start
      23 August 2016
      Completion
      18 February 2017
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱16,661,728
    • Concreting of Brgy. Poblacion IV FMR, Brgy. Poblacion IV, Calatagan, Batangas

      Barangay 4 (Pob.) Roads 16DB0097

      Contract details
      Full description
      Concreting of Brgy. Poblacion IV FMR, Brgy. Poblacion IV, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,954,586
    • Concreting of Brgy. Talisay FMR, Brgy. Talisay, Calatagan, Batangas

      Talisay Roads 16DB0098

      Contract details
      Full description
      Concreting of Brgy. Talisay FMR, Brgy. Talisay, Calatagan, Batangas
      Type
      Roads
      Contractor
      RICH ADS CONSTRUCTION CORP. (FORMERLY RICH ADS CON
      Bidders
      2
      Approved budget (ABC)
      ₱1,980,000
      Start
      5 April 2016
      Completion
      3 June 2016
      Source of funds
      Outside Infra - GAA 2016 DA Farm-to-Market Roads
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,953,854
    • Calatagan RHU, Brgy. Carlosa, Calatagan, Batangas

      Carlosa Buildings and Facilities 16DB0114

      Contract details
      Full description
      Calatagan RHU, Brgy. Carlosa, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      8 J'S CONSTRUCTION & GENERAL MERCHANDISE
      Bidders
      2
      Approved budget (ABC)
      ₱1,485,000
      Start
      22 November 2016
      Completion
      20 January 2017
      Source of funds
      Outside Infra - GAA 2016 DOH HFEP
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱1,481,800
    • Construction of 3STY 6CL at Lucsuhin NHS, Calatagan, Batangas

      Lucsuhin Buildings and Facilities 16DB0118

      Contract details
      Full description
      Construction of 3STY 6CL at Lucsuhin NHS, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      VICMAR CONSTRUCTION, INC.
      Bidders
      1
      Approved budget (ABC)
      ₱10,164,460
      Start
      24 May 2016
      Completion
      20 October 2016
      Source of funds
      Outside Infra - GAA 2016 DepED BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱10,162,900
    • Construction of Senior High School, Two (2) Units 4 Storey 24 Classroom at Calatagan SHS, Calatagan, Batangas

      Buildings and Facilities 16DB0123

      Contract details
      Full description
      Construction of Senior High School, Two (2) Units 4 Storey 24 Classroom at Calatagan SHS, Calatagan, Batangas
      Type
      Buildings and Facilities
      Contractor
      R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO
      Bidders
      2
      Approved budget (ABC)
      ₱70,728,089
      Start
      9 June 2016
      Completion
      30 September 2017
      Source of funds
      Outside Infra - GAA 2016 DepED BEFF
      Implementing office
      DPWH Batangas 1st DEO
      Record
      This contract on BetterGov Transparency
      Year2016 Status Completed Budget ₱70,317,503

    Listed, not counted

    Work near Calatagan that cannot be placed in it

    DPWH describes these contracts without placing them in Calatagan alone, so they are not in the totals above. They are listed so nothing mentioning Calatagan is quietly left out.

    On the Nasugbu–Lian–Calatagan national road

    51 contracts · ₱2,400.2M · kilometre posts given, municipality not stated

    Show the 51 road contracts
    DPWH contracts on the Nasugbu–Lian–Calatagan road with no municipality stated
    YearContractStatusBudget
    2026 Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads-Nasugbu-Lian-Calatagan Rd - K0105 + 000 - K0106 + 000 26DB0036 For Procurement —
    2026 OO1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads-Nasugbu-Lian-Calatagan Rd - K0118 + 000 - K0118 + 167, K0119 + 200 - K0119 + 573 26DB0041 For Procurement —
    2026 Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads-Nasugbu-Lian-Calatagan Rd - K099 + -600 - K099 + 354 26DB0225 For Procurement —
    2025 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Bridge Program-Rehabilitation/ Major Repair of Permanent Bridges - Cuaco Br. (B03178LZ) along Nasugbu-Lian-Calatagan Rd 25DB0024 Completed ₱4,753,000
    2025 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Bridge Program-Rehabilitation/ Major Repair of Permanent Bridges - Matala Br. (B03179LZ) along Nasugbu-Lian-Calatagan Rd 25DB0025 Completed ₱2,851,840
    2025 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Bridge Program-Retrofitting/ Strengthening of Permanent Bridges - Bagbag Br. (B00056LZ) along Nasugbu-Lian-Calatagan Rd 25DB0027 Completed ₱11,408,376
    2025 Organizational Outcome 1 : Ensure Safe and Reliable National Road System - Bridge Program - Construction of New Bridges - Puting Kahoy Br. Along Nasugbu-Lian-Calatagan Rd 25DB0093 On-Going ₱93,604,147
    2025 Organizational Outcome 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Nasugbu-Lian-Calatagan Rd - K0107 + 750 - K0108 + 241, K0108 + 289 - K0108 + 500 25DB0105 Completed ₱48,676,942
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Network Development Program-Road Widening - Secondary Roads-Nasugbu-Lian-Calatagan Rd - K0108 + 500 - K0109 + 000 24DB0011 Completed ₱19,600,000
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Bridge Program-Rehabilitation/ Major Repair of Permanent Bridges-Balibago Br. (B03180LZ) along Nasugbu-Lian-Calatagan Rd 24DB0012 Completed ₱4,900,000
    2024 Org OUTCOME1: Ensure Safe & Reliable National Rd Sys-Asset Preservation Prog-Prev Maint-Sec Rd -Nasugbu-Lian-Calatagan Rd (S05012LZ) - K0106 + 000 - K0106 + 500, K0107 + 000 - K0108 + 000, K0112 + 000 - K0112 + 340, K0112 + 923 - K0113 + 600 24DB0055 Completed ₱144,750,000
    2024 Organizational Outcome 1:Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Secondary Roads-Nasugbu-Lian-Calatagan ROAD-K0099+(-150)-K0099+000 24DB0060 Completed ₱14,700,000
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Secondary Roads - Nasugbu-Lian-Calatagan Rd - K0100 + 500 - K0101 + 244 24DB0061 Completed ₱28,271,040
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Secondary Roads - Nasugbu-Lian-Calatagan Rd - K0102 + 000 - K0103 + 200 24DB0062 Completed ₱144,750,000
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Secondary Roads - Nasugbu-Lian-Calatagan Rd - K0124 + 000 - K0124 + 746 24DB0064 Completed ₱14,347,200
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Secondary Roads -Nasugbu-Lian-Calatagan Rd (S05012LZ) - K0113 + 600 - K0114 + 000, K0115 + 000 - K0116 + 400 24DB0065 Completed ₱144,750,000
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Nasugbu-Lian-Calatagan Rd - K0106 + 200 - K0107 + 621 24DB0066 Completed ₱43,120,000
    2024 Org Outcome 1:Ensure Safe & Reliable National Rd Sys-Asset Preservation Prog-Preventive Maint-Secondary Roads -Nasugbu-Lian-Calatagan Rd (S05012LZ)-K0116 + 400-K0117 + 000, K0119 + 574 - K0119 + 644, K0120 + 066-K0122 + 000, K0123 + 000 - K0123 + 500 24DB0074 Completed ₱144,750,000
    2024 Organizational Outcome 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Secondary Roads -Nasugbu-Lian-Calatagan Rd - K0106 + 500 - K0107 + 000, K0110 + 000 - K0111 + 491 24DB0081 Completed ₱144,595,293
    2023 Organizational Outcome 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Nasugbu-Lian-Calatagan Rd - K0106 + 500 - K0107 + 750 23DB0006 Completed ₱60,311,260
    2023 Organizational Outcome 1 : Ensure Safe and Reliable National Road System - Bridge Program - Rehabilitation/Major Repair of Permanent Bridges - Lian Br. (B03176LZ) along Nasugbu-Lian-Calatagan Rd 23DB0014 Completed ₱14,698,760
    2023 Organizational Outcome 1 : Ensure Safe and Reliable National Road System Asset Preservation Program Preventive Maintenance - Secondary Roads Nasugbu-Lian-Calatagan Rd - K0099 + 456 - K0100 + 500, K101 + 269 - K0102 + 000 23DB0053 Completed ₱72,373,760
    2023 Organizational Outcome 1 : Ensure Safe and Reliable National Road System Asset Preservation Program Preventive Maintenance - Secondary Roads Nasugbu-Lian-Calatagan Rd - K0104 + 140 - K0105 + 000 23DB0054 Completed ₱50,178,760
    2023 Organizational Outcome 1 : Ensure Safe and Reliable National Road System Asset Preservation Program Preventive Maintenance - Secondary Roads Nasugbu-Lian-Calatagan Rd - K0108 + 500 - K0109 + 000, K0109 + 018 - K0110 + 000 23DB0055 Completed ₱71,891,260
    2023 Organizational Outcome 1 : Ensure Safe and Reliable National Road System Asset Preservation Program Preventive Maintenance - Secondary Roads Nasugbu-Lian-Calatagan Rd - K0111 + 000 - K0112 + 000 23DB0056 Completed ₱57,888,966
    2023 Organizational Outcome 1 : Ensure Safe and Reliable National Road System Asset Preservation Program Preventive Maintenance - Secondary Roads Nasugbu-Lian-Calatagan Rd - K0114 + 000 - K0115 + 000 23DB0064 Completed ₱57,898,760
    2022 Asset Preservation Program- Preventive Maintenance- Secondary Roads- Nasugbu-Lian-Calatagan Rd - K0109 + 018 - K0109 + 515 22DB0001 Completed ₱15,026,335
    2022 Asset Preservation Program -Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads-Secondary Roads Nasugbu-Lian-Calatagan Rd - K0099 + 456 - K0099 + 721 22DB0005 Completed ₱7,840,000
    2022 Asset Preservation Program- Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads-Nasugbu-Lian-Calatagan Rd - K0113 + 605 - K0115 + 841 22DB0008 Completed ₱49,219,825
    2022 Network Development Program - Road Widening - Secondary Roads- Nasugbu-Lian-Calatagan Rd - K0104 + 060 - K0105 + 000 22DB0013 Completed ₱55,005,000
    2022 Network Development Program - Road Widening Secondary Roads Nasugbu-Lian-Calatagan Rd - K0105 + 000 - K0106 + 500 22DB0014 Completed ₱87,139,500
    2021 Network Development-Road Widening-Secondary Roads-Nasugbu-Lian-Calatagan RD-K0103+000-K0104+060 21DB0007 Completed ₱72,375,000
    2021 Network Development-Road Widening-Secondary Roads - Nasugbu-Lian-Calatagan RD-K0119+000-K0119+492 21DB0008 Completed ₱29,081,500
    2021 Bridge-Replacement of Permanent Weak Bridges-Talisay Br. (B00051LZ) along Nasugbu-Lian-Calatagan Rd 21DB0014 Completed ₱29,400,000
    2020 Network Development Program-Road Widening-Secondary Roads Nasugbu-Lian-Calatagan Rd - K0111+707.5 - K0112+344, K0112+364 - K0112+780 20DB0012 Completed ₱52,595,220
    2020 Network Development Program-Road Widening-Secondary Roads Nasugbu-Lian-Calatagan Rd. - K0122+000 - K0124+746 20DB0013 Completed ₱69,528,970
    2020 Network Development Program-Off-Carriageway Improvement-Secondary Roads Nasugbu-Lian-Calatagan Rd - K0112+780 20DB0015 Completed ₱9,798,860
    2020 Bridge Program-Widening of Permanent Bridges, Cuaco Br. (B03178LZ) along Nasugbu-Lian-Calatagan Rd 20DB0024 Completed ₱14,332,931
    2019 Asset Preservation-Preventive Maintenance-Secondary Roads, Nasugbu-Lian-Calatagan Road - K0107+209 - K0108+000, K0114+890 - K0116+846, K0120+066 - K0121+000, K0123+000 - K0124+746 19DB0003 Completed ₱77,200,000
    2019 Network Development-Road Widening-Secondary Roads, Nasugbu-Lian-Calatagan Rd. - K0113+605 to K0115+840.80 19DB0007 Completed ₱86,850,000
    2019 Bridge-Widening of Permanent Bridges-Bagbag Br. (B00056LZ) along Nasugbu-Lian-Calatagan Rd. - K0101+243.5 19DB0018 Completed ₱20,580,000
    2019 Network Development-Road Widening-Secondary Roads, Nasugbu-Lian-Calatagan Road - K0118+000-K0119+000 19DB0112 Completed ₱29,398,860
    2018 Asset Preservation Program- Preventive Maintenance - Secondary Roads along Nasugbu-Lian-Calatagan Rd. K0099+000-K0099+343, K0103+000-K0104+140, K0106+000-K0106+500 18DB0003 Completed ₱28,517,950
    2018 Asset Preservation Program-Rehab./Reconst./Upgrading of Damaged Paved Roads-Secondary Roads along Nasugbu-Lian-Calatagan RD-K0117+000-K0118+000 18DB0008 Completed ₱40,957,140
    2018 Asset Preservation Program-Const./Upgrading/Rehab. Of Drainage along National Roads-Secondary Roads along Nasugbu-Lian-Calatagan Rd - K0101+000-K0101+243.5, K0101+268-K0102+000 18DB0012 Completed ₱13,732,645
    2018 Widening of Permanentbridge, Balibago Br. (B03180LZ) along Nasugbu-Lian-Calatagan Rd. 18DB0021 Completed ₱11,524,630
    2018 Network Development Program-Road Widening-Secondary Roads along Nasugbu-Lian-Calatagan Rd - K0109+018-K0111+000 18DB0087 Completed ₱96,500,000
    2018 Network Development Program-Road Widening-Secondary Roads along Nasugbu-Lian-Calatagan Rd - K0115+840.8-K0116+833.8 18DB0091 Completed ₱49,000,000
    2016 Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on Pavement Management System/Highway Development and Management (HDM-4) along Nasugbu-Lian- Calatagan Road K0111+000 - K0112+352 16DB0028 Completed ₱31,421,250
    2016 Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Includingdrainage Based on Pavement Management System/Highway Development and Management (HDM-4) along Nasugbu-Lian- Calatagan Road, K0116+875-K0117+000 16DB0029 Completed ₱2,985,938
    2016 Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on Pavementmanagement System/Highway Development and Management(HDM-4) along Nasugbu-Lian-Calatagan Road K0112+925-K0114+000 16DB0030 Completed ₱25,166,400

    Packages shared with other municipalities

    2 contracts · one budget covering sites in more than one town

    • 1. Conc of Rd in Sitio Tanag Brgy. San Diego, Lian; 2. Conc of Rd in Brgy. Quilitisan, Calatagan; 3. Const of FMR in Brgy. Munting Indang, Nasugbu; 4. Conc of Rd in Brgy. Tanagan, Calatagan, Batangas

      21DB0140

      Year2021 StatusCompleted Budget₱3,880,279
    • Construction (Completion) of MPB, Brgy. Baligabo, Lian; Brgy. Banilad and Brgy. Papaya, Nasugbu; Brgy. Bolbok, Tuy; Brgy. Carretonan, Calatagan; Municipal Plaza, Brgy. Luna, Tuy, Batangas

      20DB0035

      Year2020 StatusCompleted Budget₱5,810,808

    269 DPWH records mention “Calatagan”; 37 of them are elsewhere (for example a creek in Makati, a barangay in Virac, bridges on the road placed in Lian) and are not listed.

    Search BetterCalatagan

    Try

    ↑↓ to move Enter to ask or open Answers come only from published, sourced records.

    Document

    Opening document…

    Fetching the file from the Internet Archive.

    Shown straight from the Internet Archive, unaltered; nothing is stored on this site. Download or open the original from the bar above.

    Ask BetterCalatagan

    Answers only from this site’s published, sourced records

    What would you like to know about Calatagan?

    Ask in English, Filipino or Taglish. Every answer is written from the census, the municipality’s filings and the history on this site, and links to the record it rests on. Where the site has no verified answer, it says so.

    Answers can be wrong: check the source each one cites. BetterCalatagan doesn’t save your questions. How the assistant works